Modular Building, Manchester as Garden Office
Recently installed into our clients garden, errected on site and ready for occupation 24 hours after delivery. It is fully insulated thus offering a year round facility. Easily connected to mains electricity and other office facilities.

A clean comfortable enviroment whatever your application all year round.

============================

BAM Construction, Modular Building in Clan Clwyd as Patient Record Storage
BAM Construction are carrying out extensive works at Clan Clwyd Hospital part of which is a total refurbishment of their patient record store. A medium term solution was required and BAM turned to Danzer to help them. Danzer provided a single storey record facility with some additional offices at first floor.
The ground the unit was being placed on, slopes dramatically so extensive foundation had to be installed to take the weight of the building ,with the documents in, and to ensure it remained flat to allow the rolling archive system to operate. The restricted space also lead to a complicated ramp and staircase to enable access.

============================

BAM Aintree Project, Triple Storey Modular Building
BAM are carrying out extensive development work at Aintree and as part of that development are knocking down and removing an old modular building which provided office accommodation for the consultants and some administrative staff. A site within the Aintree complex was allocated and BAM turned to Danzer to come up with a solution.
The new building would need to connect with an existing building at height to provide access to the second floor. However the floor levels did not meet requiring a “filler” level, in the new building, something other manufacturers were unable to provide.
Danzer provided the building using its Steel OpenSpace product with 15no 9.6 x 3m modules over 2 floors and an intermediate filler level. The building also included an enclosed staircase and a canopy walkway across part of the front and the side elevation to enable access to the existing building at ground floor level.

============================

Triple Storey Modular Buildings For Woodlands School Project
Layout drawing and picture of our 72 week triple storey building project at Woodlands School, the accommodation consists of: Ground floor security/ induction/ toilet block, open space canteen with full server.
Second floor open space sub-contractors offices, 3 bays of open-space, drying rooms, toilets and, showers and, kitchen server room.
Third floor heated/cool air con and carpet tiles, double glazed windows, motion sensor lighting etc.

============================