OpenSpace is bigger on the inside.

OpenSpace is part of a suite of interconnected products offered exclusively by the AVDanzer Group. OpenSpace is specifically designed to provide fast, efficient, open plan spaces that are highly affordable and can grow with your requirements – without the encumberances of certain building regulations. And if you order one today, your site could be operational the next.

For our portable modular buildings products please ask about LinkPak NG. We also have a dedicated rental division in Rentacabin. Our robust and secure steel products form the amazing Danzer range. And for full site preparation and services, we have SiteFirst.
All these products are only available from AVDanzer.

Often, things aren’t what they first seem, but some things like OpenSpace are reassuringly better than you might think. Anti-vandal, practical, and open plan, OpenSpace is flexible, expandable, works with standard fleet units, and can be installed anywhere.

With phased installation you could be up and running within 24 hours!

OpenSpace maximises all your on-site accommodation potential, growing while you grow. It’s fast, it’s cheap, and it’s incredibly flexible.

AV Group installed these 30 units providing welfare, contractor and site office accommodation. The installation has a viewing gallery on the roof of the complex to allow BAM, their client and visitors to observe the project during construction.

We have used a combination of standard hire fleet units, and OpenSpace modules, making installing a project on this scale much faster, and far more economic than might at first seem.


ST ANDREWS PRIMARY


 
We are delighted with the new shower and changing room facility we have provided for St. Andrews Primary School in Cobham. The school approached AV Danzer to design a stand-alone facility which could sit adjacent to its swimming pool which is located at the side of the playing fields. We suggested a highly cost-effective solution using our OpenSpace product which could also be delivered quickly to meet their tight time frame.The children had previously had to change in the school building before walking across the playground to join their swimming lesson. Read more…


ELLERSLIE RETIREMENT VILLAGE


 
In another great project for Wates Construction AV Group has been commissioned to provide on-site contractor accommodation during the construction of a magnificent new retirement village in Worcester.We have installed eighteen 9.7m x 3m OpenSpace modules which will provide canteen, relaxation areas, toilets, washrooms and changing facilities for the extensive team of contractors and sub-contractors. Our OpenSpace product was specified yet again by Wates because it is specifically designed to provide fast, efficient, open plan spaces which can be on site and operational within just days of ordering. Read more…



BROOKLANDS SAND AND AGGREGATES


 
Danzer has recently installed new office accommodation for Brooklands at its Littlejohns pit in St Austell, Cornwall. Dubbed Cornwall’s White Mountains because the of china clay production, the St Austell quarry is on one of the highest points in Cornwall and is exposed to high winds which made this project quite a challenging installation. We built four 12x3m modules at our Langley Mill site which together creates a 24x6m office facility to house the weighbridge operatives.We had to plan the delivery and installation some three weeks in advance because it was necessary to block the site access to lift the new buildings into place. Read more…


NORTHERN HUB


 
In 2015 Danzer was commissioned to provide the on-site welfare and office accommodation facilities for Network Rail’s prestigious Northern Hub project in a contract worth over £700,000. After the Government finally gave the green light for the Northern Hub project to continue we were able to release the remaining modules and have this month installed them at Ashburys in East Manchester. The units are end and side linked and sited in a double stack of 13 ground floor units and 13 first floor and will provide office facilities for the construction teams. Read more…



IRON MOUNTAIN


 
Manufactured by Danzer Limited at our Langley Mill site in Nottingham, the three 3m x 9.6m steel modules create the storage vault which is linked to the main Iron Mountain depot. 95% of the fit-out was completed at Langley Mill in order to allow rapid installation at Damastown. Consequently, the units were pre-installed with insulated wall and ceiling panels, mobile shelving, fire alarms, a pressure relief system, security system and air conditioning. Read more…


WILBURN ST BASIN


 
Phases one and two of a 500 unit residential scheme. Renaker Build is a rapidly growing Manchester based developer and they have chosen once again to invest in our quality welfare units to showcase their growing stature in the market place. We are also working with Renaker Build on the 1 Water Street scheme off Regent Road in Manchester, a 28-storey residential building with 301 apartments. We’re supporting the team with 12 Open Space units to provide site accommodation and office space for staff and contractors at its Mackintosh Mills development on Cambridge Street near Manchester’s Oxford Road Station. Read more…



NORTHERN HUB


 
Our production team at Langley Mill worked at full speed to build the 52 steel Open Space units which are used on two sites at Ashburys and at Bolton. The units are end-linked and sited in a double stack of 13 ground floor units and 13 first floor and will provide office facilities for Skanska/BAM. Read more…


LEWISHAM YOUTH CENTRE


 
This new building comprises eight 24’ x 8’ steel anti-vandal units, with toilet facilities, disabled toilets, UPVC windows with added security grills, kitchen and storage areas. We delivered a full turnkey service including ground works, organising utility connections, commissioning and fit out to create a bright, safe modern space for young people to meet and participate in activities together. Read more…



RUDHEATH HIGH SCHOOL


 
Site access was very limited, requiring our team to source a small specialist manoeuvrable crane. The installation was carried out from the narrow site gateway, with the crane’s support outriggers having just enough room to steady the lift. A further level of complexity was added, because the crane had to be occasionally de-rigged to allow traffic to pass to the adjacent industrial estate. Read more…


CHELSEA ROADSWEEPERS


 
Seven OpenSpace units were delivered to site from our Nottingham production depot and we carefully installed them on a steel gantry to make the best use of available space. The facilities include toilets, washrooms, male and female showers, changing room spaces,lockers and recreational space which will be used by the council’s road sweeping staff. One unusual feature of the project included knee operated taps for the hand basins. Read more…



SOMERSET FRUIT PROCESSING


 
We completed this fantastic new modular building which provides changing facilities for a fruit processing site in Somerset. Built by the team at our Langley Mill plant it comprises 7 x 12m x 3m Open Space modules and provides a highly specified replacement changing facility for staff. The building, which is profiled steel, is designed and specified to ensure staff to adhere to the highest possible level of hygiene. It features stainless steel urinals, wash basins, WCs, automatic, touch-free taps, Dyson Air-blade hand dryers, diffusers to lighting, double sided benching and lockers. Read more…


OFFICES IN DENTON


 
This is a 9 module building totalling 263m2, and cost £95,000 in total. It has large aluminium framed double glazed windows with vinyl faced plasterboard linings throughout. In the style of our hugely popular and innovative HighLine buildings we have increased ceiling heights adding to the spaciousness and airiness of the environment. We upgraded insulation all around including under the floors, and added sound reducing insulation to all partitioning. Read more…



AINTREE HOSPITAL


 
This new building would need to connect with an existing building at height to provide access to the second floor. However the floor levels did not meet requiring a “filler” level, in the new building, something other manufacturers were unable to provide. Danzer provided the building using its Steel OpenSpace product with 15no 9.6 x 3m modules over 2 floors and an intermediate filler level. The building also included an enclosed staircase and a canopy walkway across part of the front and the side elevation to enable access to the existing building at ground floor level. Read more…

 

Like to know more?